M
Place two 48" Support Frames(F) on top of feet and using Clamps(K)
with thick part up, fasten to downrod using Hex Bolts(L) and Nuts(J).
Make sure ends of Support Frames(F) are even and square. Place 48"
Support Frames(G) on top of 48" Support Frames (F) and loosely bolt
together in each corner using ¼" Hex Bolts(M) and Nuts(N) using a
7/16" wrench or nut driver. Do not tighten until after placing grids.
PLACE AND ATTACH GRIDS
Lay 4 Wire Grids(A) evenly on 48" Support Frames(G) with grid stiffeners on the underside. Loosen & tilt the 48"
Support Frames(G) if necessary. Tighten bolts in each corner of support frames using ¼" Hex Bolts(M) and
Nuts(N) wth a 7/16" wrench or nut driver. Fasten Wire Grids(A) as shown using 4 Hex Bolts(I) and Hex Nuts(J) for
each grid.
Make sure that all nuts, bolts and screws are tight. Do not load with more than 300 lbs, evenly distributed.
ATTACH SUPPORT FRAMES
M
Loosen & tilt the 48" support
frames to allow grids
to lay on directly on ledge.
Page 5 of 12