M-14-25
LIFT CORPORATION Sht. 8 of 58 DSG#
Rev. E Date: 08/13/19
PREPARE LIFTGATE - Continued
REMOVE KNOCKOUTS
4. Verify which knockouts to remove from
the bottom of main frame housing (FIG.
8-1). Then, remove the knockouts as
needed.
KNOCKOUTS
MAIN FRAME
REMOVING KNOCKOUTS FROM
MAIN FRAME HOUSING
FIG. 8-1