Barrette Elite 73013137 Instrucciones De Instalación página 7

Barandal de aluminio
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

S
R
TRAIGHT
AIL WITH
3
3
Cut rails to length (top rail, bottom rail, top rail profi le).
a. Place bottom rail across post opening leaving equivalent spacing from last baluster to post on each end. Make sure there is even spacing from
baluster hole to post.
b. Mark rail fl ush to post.
c. From marked line, mark additional parallel line
d. Align top rail and top rail profi le with bottom rail and mark before cutting to size. Then cut same lengths with a saw (use fi ne tooth carbide blade).
a.
4
4
Build out rail section
a. Place top and bottom rail on a smooth, fl at and clean surface. Then, orient
the top and bottom rails so that the ridges inside the rails are oriented in
the top and bottom rails so that the ridges inside the rails are oriented in
the top and bottom rails so that the ridges inside the rails are oriented in
the same direction. NOTE: There are two (2) ridges on both sides, but of
the same direction. NOTE: There are two (2) ridges on both sides, but of
the same direction. NOTE: There are two (2) ridges on both sides, but of
the same direction. NOTE: There are two (2) ridges on both sides, but of
different sizes.
different sizes.
b. Thread all balusters through the holes in rails being careful to have the
b. Thread all balusters through the holes in rails being careful to have the
b. Thread all balusters through the holes in rails being careful to have the
"hole" in each baluster going in the same direction (and facing the two small
"hole" in each baluster going in the same direction (and facing the two small
ridge/score line side)
c. Make sure balusters threaded through rails are about 2" above rail and in-
line with each other.
d. Snap in bumps from plastic locking strip into holes of the balusters for both
d. Snap in bumps from plastic locking strip into holes of the balusters for both
d. Snap in bumps from plastic locking strip into holes of the balusters for both
top and bottom rails. Make sure arrows on locking strips face rails.
top and bottom rails. Make sure arrows on locking strips face rails.
e. If the rails were cut shorter in Step 3, then
there will be some "extra" locking strip at the
there will be some "extra" locking strip at the
there will be some "extra" locking strip at the
end of install. Use scissors to cut off excess
end of install. Use scissors to cut off excess
(leave approximately 2" of strip after the last
(leave approximately 2" of strip after the last
(leave approximately 2" of strip after the last
engaged bump).
engaged bump).
f. Push fi rst baluster into bottom rail, followed
by the second and third, until the last baluster.
by the second and third, until the last baluster.
by the second and third, until the last baluster.
Then repeat for top rail. The engagement
Then repeat for top rail. The engagement
between the rails, balusters and locking strip
is about 75% at this point.
V
T
INYL
OPPER AND
⁄" from fi rst line, to allow for bracket clearance.
" from fi rst line, to allow for bracket clearance.
3
3
3
8
8
8
8
b&c.
7
P
I
OST
NSTALLATION
d.
a.
Top Rail Opening Facing Up
Top Rail Opening Facing Up
b&c.
b&c.
d. d.
Top view of rail
"score" inside
Two
Two
Two
Small
Large
Ridges
Ridges
Bottom Rail Opening Facing Down
Bottom Rail Opening Facing Down
2"
Arrows on opposite side, pointing down
Two
Two
Large
Small
Ridges
Ridges
Two small ridges/
Score line side
Two large
ridges side

Publicidad

Tabla de contenido
loading

Tabla de contenido