S
R
TRAIGHT
AIL WITH
7
7
Rails to Posts
a. Bring assembled rails between posts, elevated
above brackets
b. Once centered, slowly lower rail assembly
carefully to allow full engagement between
section and brackets in all four locations on
posts. NOTE: The top top rail profi le should rest
on the bottom of the bracket that is screwed
into post
c. Attach top brackets to top rails – Predrill two
holes from under the bottom of the top rail
through rail. Complete for each top rail bracket.
Drive #8x1
⁄
⁄" Pan Head screws (2 per bracket)
⁄
" Pan Head screws (2 per bracket)
1
2
2
2
2
through drilled holes.
8
8
Finishing Up
Secure vinyl post tops to posts.
V
T
INYL
OPPER AND
9
P
I
OST
NSTALLATION