Descargar Imprimir esta página

Maxon 298901-01 Manual De Instrucciones página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

9. Raise platform to bed height (FIG. 5-1).
10. Slide the bottom spacer pad down
against wedge until there is no
clearance between inner column
and spacer pad (FIG. 5-2). Then,
back off (slide up) bottom pad by
1 hole position to create clearance
between pad and inner
column.
11. Bolt bottom spacer pad to LH
runner with 2 bolts and 2 lock
washers (FIG. 5-3). Torque
the 2 bolts to 9-14 lb-ft.
12. Slide the top spacer pad up against
wedge until there is no clearance
between inner column and spacer
pad (FIG. 5-3). Then, back off (slide
down) bottom spacer pad by 1
hole position to create clearance
between pad and inner column.
© MAXON Lift Corp. 2017
LIFT CORPORATION Sht. 5 of 18 DSG#
PLATFORM RAISED TO BED HEIGHT
INNER
COLUMN
BOTTOM
SPACER PAD
WEDGE
LH
RUNNER
ADJUSTING LOWER PAD
BOLT HOLES
TO ADJUST
PAD POSITION
(8 PLACES)
INNER
COLUMN
BOTTOM
SPACER PAD
BOLTING LOWER PAD &
ADJUSTING UPPER PAD
M-17-17
Rev. A Date: 12/20/17
FIG. 5-1
BOLT HOLES
TO ADJUST
PAD POSITION
(8 PLACES)
FIG. 5-2
LOCK WASHER
(2 PLACES)
FIG. 5-3
LH
RUNNER
TOP
SPACER PAD
WEDGE
BOLT &

Publicidad

loading