Swing-N-Slide PB 9240 Instrucciones De Ensamblaje página 51

Tabla de contenido

Publicidad

Fig. 39
(4)
1-1/2'' screws
tornillos de 1-1/2''
[PF 3628] 1'' x 4'' x 20''
UNDER SIDE VIEW
VISTA INFERIOR
Fig. 39b
2'' Below
Grade
2'' por debajo del
nivel del terreno
1'' Truss screw
Tornillo de cabeza
segmentada de 1''
1-1/4'' screw
Tornillo de 1-1/4''
1-1/2'' screw
Tornillo de 1-1/2"
Slide Install.
1. Install Slide Support Board under Front Opening as shown in (Fig. 39).
2. Install Slide centered in the provided opening as shown in (Fig. 39a).
3. Prepare a level area of ground where the bottom of the slide rests 2" below grade (Fig. 39b).
4. Mark where the slide's bottom meets the ground and drive a 2" x 4" x 17-1/4" stake until its top is 2'' above the grade prepared in Step 3. For reference, see (Fig.
39b).
5. Attach Slide to Stake using (2) 1-1/4'' screws as shown in (Fig. 39a).
Instalación del tobogán
1. Instale la tabla de soporte del tobogán por debajo de la abertura frontal, tal como se muestra en la (Fig. 39).
2. Instale el tobogán centrado en la abertura provista como se muestra en la (Fig. 39a).
3. Prepare una superficie nivelada, a 2" por debajo del nivel del terreno, sobre la cual vaya a reposar la parte inferior del tobogán (Fig. 39b).
4. Marque el lugar donde la parte inferior del tobogán llega al suelo y clave una estaca de 2" x 4" x 17-1/4" hasta que el extremo superior quede 2'' por encima del
nivel del terreno preparado en el paso 3. Como referencia, consulte la (Fig. 39b).
5. Fije el tobogán a la estaca con (2) tornillos de 1-1/4'', tal como se muestra en la (Fig. 39a).
Assembly Instructions / Instrucciones de ensamblaje
Surfacing
Material
Material de
recubrimiento
2'' Above Grade
2'' por encima del
nivel del terreno
SLIDE STAKE
ESTACA DEL
TOBOGÁN
1-1/4'' screws
tornillos de 1-1/4"
51
Fig. 39a
(4)
1'' Truss screws
tornillos de cabeza
segmentada de 1''
(2)
2'' x 4'' x 17-1/4''
PF 3419

Publicidad

Tabla de contenido
loading

Tabla de contenido