Only the professionals qualified for electrical operation are allowed to conduct the electrical installation.
Open the upper cover of the control cabinet first and then connect the power line: Connect the 400V three-phase four-wire
power line (cable of 3×2.5MM
ground wire to the marked ground bolt firstly and then to the marked ground bolts at the bottom of the two platforms (Fig. 6).
In case of 230V three-phase power supply, it is required to adjust the wiring of control transformer and the motor (Fig. 7).
L1 L2 L3 PE
Fig. 6
The limit switch of the main lift is installed in the switch frame at the bottom of the main lift crossbeam (Fig. 8), and the lead is connected
to the terminal in the control cabinet after passing through the buried PVC pipe; the limit switch of the sub lift is installed in the switch
frame at the base frame of the sub lift (Fig. 9), and the lead is connected to the terminal in the control cabinet after passing through the
buried PVC pipe;
Fig. 8 (Limit switch of main lift)
48
AE5301S/AE5301-3S
2
2
+ 1×1.5MM