1. Remove the small parts and manual kit from
the housing. Refer to Sheets 4 & 5 for con-
tents of the kits.
2. Install circuit breaker and bracket (Kit item)
(FIGS. 17-1 and 17-2) on the truck battery tray
inside the engine compartment (FIG. 17-2).
Allow enough room for power cables to be run
and for easy access to circuit breaker.
MAIN FRAME
HOUSING
3. Pull the (+) and (-) power cables
through the cord grip on back of main
frame housing. Leave about 2" of
slack, for power cables, inside main
frame housing.
4. Route power cables along truck
frame to truck battery (FIG. 17-1).
Pull extra cable beyond the battery
terminals. Then, separate positive
(+) cable from negative (-) cable.
LIFT CORPORATION Sht. 17 of 56 DSG#
ROUTING POWER CABLES
(+) CABLE
(-) CABLE
TRUCK ENGINE
COMPARTMENT
M-16-32
RUNNING POWER CABLES FROM
LIFTGATE TO BATTERY
HEX HEAD SELF-
DRILLING SCREW
(2 PLACES)
BATTERY
& TRAY
BATTERY
TRAY
BOLTING CIRCUIT BREAKER & BRACKET
TO TRUCK BATTERY TRAY (TOP VIEW)
FIG. 17-2
Rev. C Date: 08/13/19
CIRCUIT
BREAKER &
BRACKET
FIG. 17-1
1/4"-20 SCREW
& 1/4"-20 NUT
(2 PLACES)
BRACKET
"AUX"
TERMINAL
BATTERY
"BAT"
TERMINAL
CIRCUIT
BREAKER