INSTALATION & ASSEMBLY (cont.):
8.
Feed the Wires (#7, #8 & #15) of the Three-
Head Lantern Assembly (#19) through the
entire Pole/Base Assembly (#20) to the
bottom opening.
Assembly (#20) into the Wire Housing (#5)
of the Three-Head Lantern Assembly (#19)
(Fig. 4).
9.
Select the desired installation location. Run supply
wires from the breaker panel to the desired
location and prepare the concrete surface. (If you
are unfamiliar with proper electrical practices,
obtain services of a qualified electrician.) When
preparing the concrete surface, be sure that the
Wire Conduit (#27), protecting the supply wires,
extends 1/2" above the Concrete Surface (#28) to
prevent any runoff from entering. Using the
provided Template (#29), mark the locations for
the mounting holes. At the marked locations, drill
½" diameter Holes (#30) approximately 3" deep.
Do not exceed a 3" depth (Fig. 5).
10. Insert the Anchors (#31) into the Holes (#30)
(Fig. 5).
30. Hole
28. Concrete Surface
Screw the Pole/Base
31. Anchor
19. Three-
Head Lantern
Assembly
5. Wire
Housing
20. Pole/Base
Assembly
Wires
Fig. 4
27. Wire Conduit
Fig. 5
Page 8