Tools And Materials Required - Kohler MEMOIRS K-2258 Instrucciones De Instalación

Ocultar thumbs Ver también para MEMOIRS K-2258:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TOOLS AND MATERIALS
REQUIRED
S
Level
S
Drill with assorted bits
S
9/16" wrench
INSTALLATION
S
Rough-in the supplies and the drain
piping.
NOTE:
The supply stop handles cannot
extend more than 3" (7.6cm) from the
finish wall when in the open position.
S
Install sufficient backing behind the
finish wall to provide a secure
material for the anchoring devices.
S
Apply two self-adhesive gaskets
(provided) to each of the three
ridges in the bottom recess of the
lavatory.
S
Mark the centerline on the floor.
S
Position the pedestal on the floor
centerline.
S
Carefully set the lavatory on the
pedestal.
S
Move the pedestal as required to
ensure proper fit in the desired
location.
S
Level the lavatory. Add more
self-adhesive gaskets as needed to
level the lavatory.
NOTE:
The
lavatory
supported by the pedestal.
S
Check the lavatory placement.
S
Mark the center of each anchoring
hole on the wall, and mark the floor
through the hole in the pedestal
bottom.
S
Carefully remove the lavatory from
the pedestal. Then move the
pedestal from the area.
A
1007275-2-
S
Tape measure
S
Framing square
S
Channel lock pliers
Gaskets
BOTTOM VIEW
OF LAVATORY
Finish
Wall
must
be
Center of
Anchoring
Holes
2
Kohler Co., Kohler, WI U.S.A.
Ridge
Gaskets
Ridge
Gaskets
Pedestal
Mark Floor
Here

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Memoirs k-2259

Tabla de contenido