6
Tools Needed:
Before installing the bottom section,
the weather seal (may not be included)
Level
must be installed (see PREPARING THE
OPENING on page 10)
Center the bottom section in the door
opening. Level section using wooden
shims (if necessary) under the bottom
section.
7
Tools Needed:
IMPORTANT: THE TOPS OF THE
VERTICAL TRACKS MUST BE LEVEL
3/16" Drill Bit
FROM SIDE TO SIDE. IF THE BOTTOM
Power Drill
SECTION WAS SHIMMED TO LEVEL IT.
7/16" Socket
THE VERTICAL TRACK ON THE SHIMMED
Driver
SIDE, MUST BE RAISED THE HEIGHT OF
THE SHIM.
Tape Measure
Level
Position the left hand vertical track
assembly over the rollers of the bottom
section. Make sure the counterbalance
cable is located between the rollers
and the door jamb. Drill 3/16" pilot
holes for the lag screws. Loosely fasten
jamb brackets and flagangle to the
jamb using 5/16" x 1-5/8" lag screws.
Tighten lag screw securing bottom
jamb bracket to jamb, to maintain
5/8" spacing. Hang cable drum over
flagangle. Repeat for the right hand
side.
14
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com
Bottom Section
Vertical Track
WEATHER SEAL
DOOR OPENING
LEVEL
CABLE DRUM
FLAGANGLE
5/16" X 1-5/8"
LAG SCREWS
CABLE
VERTICAL
TRACK
ASSEMBLY
JAMB
BRACKET
WOODEN SHIMS
(IF NECESSARY)
VERTICAL TRACK
BOTTOM SECTION
5/8"
ROLLER
LAG
LAG
SCREW
SCREW
LOCATIONS
LOCATIONS
12R QI FLAGANGLE
15R QI FLAGANGLE
QUICK INSTALL
JAMB BRACKET
LAG
SCREW
LOCATIONS
LAG
12R & 15R FULLY
SCREW
ADJUSTABLE FLAGANGLE