13
Tools Needed:
Place the top section in the opening.
Temporarily secure the top section
Hammer
by driving a nail in the header near
the center of the door and bending it
over the top section. Now flip up hinge
leafs, hold tight against section, and
fasten center hinges first, and end
hinges last. (Refer to Step 8). When
installing a door with a TorqueMaster®
Plus counterbalance system, vertical
track alignment is critical. Position
flagangle between 1-11/16" (43 mm)
to 1-3/4" (44 mm) from the edge of
the door; tighten the bottom lag screw.
Flagangles must be parallel to the door
sections. Repeat for opposite side.
IMPORTANT: THE DIMENSION
BETWEEN THE FLAGANGLES MUST BE
DOOR WIDTH PLUS 3-3/8" (86MM) TO
3-1/2" (89 MM) FOR SMOOTH, SAFE
DOOR OPERATION.
For quick install track:
Complete the vertical track installation
by securing the center jamb bracket(s)
and tightening the other lag screws.
Repeat for opposite side.
For fully adjustable track:
Complete the vertical track installation
by securing the center jamb bracket(s)
and tightening the other lag screws.
Push the vertical track against the
rollers so that the rollers are touching
the deepest part of the curved side of
the track (see illustration); tighten all
the track bolts and nuts. Repeat for
opposite side.
18
Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com
Top Section
NAIL
TOP SECTION
1-11/16" TO 1-3/4"
FLAGANGLE
DOOR WIDTH
+3-3/8" TO 3-1/2"
VERTICAL TRACK
ROLLER
ROLLER AGAINST
VERTICAL TRACK
FULLY ADJUSTABLE
TOP
SECTION