Preparation For Use; Connecting The Ac Power Cord; Installing Foot Control Batteries - NSK Surgic Pro2 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 161

Preparation for Use

4
4 – 1 Connecting the AC power cord
Correctly align then insert the AC power cord into the AC power cord connector socket at the back of the control unit�
4 – 2 Installing foot control batteries
1
Turn the battery cover counterclockwise�
CLOSE
● When inserting batteries, check the marking on the battery case and make sure batteries are inserted in the
correct orientation�
● Use only high-quality disposable AAA (Micro/LR03) 1�5V alkaline batteries� Using the wrong type of battery may
lead to product malfunction�
● Do not mix new and old batteries or different types of batteries�
● Do not use rechargeable batteries�
● If the device will not be used for a long period of time, remove the batteries for safety reasons� Failure to do so
poses a risk of product malfunction due to battery heating or leakage�
● Make sure that the O-ring attached to the cover is free of debris before closing the battery cover�
OPEN
CAUTION
2
Insert three AAA batteries�
3
Turn the battery cover clockwise to close�
10

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido