Installation
Ensure the power has been turned off before beginning this installation. Plug must
be assembled in places easy to drag and insert .
To install this hood you will require two
assistants. You will need the following
tools and material to complete this
installation: *Drill*Flat head screwdriver
*Phillips head screwdriver or cordless
drill and Phillips head bit*Tin snip*
*measuring tape*hand saw or jig saw*
electrical tap*duct tape
1.
Remove the range hood from the carton.
2. Lay the hood upside down on a table
covered with cardboard or paper to
prevent scratching of the table or hood.
3.
Hood installation should be within 0.6m
radius range.
4. We recommend that after installation the
bottom of the hood should be no less than
650mm and no more than 750mm above
the stove's heating elements and burners.
Installation work and electrical wiring must be wiring must be done by qualified
person(s) in accordance with all applicable codes and standards, including fire rated
construction.
V.4