Kohler Sterling 441904 Guia De Instalacion página 3

Ocultar thumbs Ver también para Sterling 441904:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Preparation
Install the water supplies and drain piping according to the
roughing-in information.
Determine which template cut line corresponds with the lavatory
model to be installed.
Cut out the template where indicated for countertop opening. Cut
along the inside of the cutting line.
Position the template on the countertop.
Verify cabinet clearance beneath the countertop.
Trace around the template on the countertop with a pencil.
2. Install the Lavatory
NOTE: To avoid possible damage to the cabinet, cut the countertop
before installing the countertop to the cabinet.
Cut out the countertop opening by carefully following the pencil
line traced from the template.
Install the countertop to the cabinet.
Install the faucet and drain to the lavatory according to the
manufacturer's instructions.
Carefully position the lavatory in the cut-out opening.
Apply a thin continuous bead of sealant around the lavatory
edge.
Immediately wipe away any excess sealant, and fill any voids as
needed.
Verify that the lavatory has not moved out of position.
Sterling
3
1010563-2-C

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sterling 441908Sterling 442004Sterling 442008Sterling 442044

Tabla de contenido