Complete The Finished Wall - Kohler K-1000-H2 Guia De Instalacion

Ocultar thumbs Ver también para K-1000-H2:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1-1/2" (3.8 cm) Max.
Finished Wall
1/2" Cement
Board
Galvanized
Nails or Screws

13. Complete the Finished Wall

CAUTION: Risk of product damage. Use care to avoid scratching the wall jambs.
NOTE: The total finished wall thickness, including furring strips, cement board, and finished wall material
must not exceed 1-1/2" (3.8 cm).
Install cement board. Position the cement board so the gap above the top of the footbath rim is no
larger than 1/4" (6 mm).
Apply a bead of silicone sealant to the seam between the cement board and the footbath.
Install the finished wall material.
Use a sharp utility knife to carefully remove the protective tape from the wall jambs.
Kohler Co.
Furring Strip
Bead of Silicone
Sealant Between
Cement Board and
Footbath
Top View
13
1/4" (6 mm)
Max.
1032118-2-D

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-1015K-1016K-5161K-1015-h2

Tabla de contenido