Fanimation SCULPTAIRE FP8511 Serie Manual De Instrucciones página 7

Ocultar thumbs Ver también para SCULPTAIRE FP8511 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

How to Assemble Your Ceiling Fan
5. Route wires and safety cable through motor coupling
cover, canopy screw cover and ceiling canopy. (Figure 5)
6. Reinstall the hanger ball on the downrod as follows.
Route the black, white and blue wires and safety cable
through the hanger ball. Position the pin through
the two holes in the downrod and align the hanger
ball so the pin is captured in the groove in the top
of the hanger ball. Pull the hanger ball up tight
against the pin. Securely tighten the set screw in the
hanger ball. A loose set screw could create fan
wobble. (Figure 6)
7. Cut off excess lead wire approximately 6 to 9 inches
above top of the downrod. Strip insulation off 1/2 inch
from the end of each lead wire. (Figure 7)
NOTE: All set screws must be checked, and retightened
where necessary, before installation.
(continued)
Ceiling Canopy
Canopy Screw
Cover
7
Motor Coupling
Cover
Figure 5
Figure 6
Figure 7

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sculptaire fan831839

Tabla de contenido