Phcbi MDF-DU302VX Manual Del Usuario página 18

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION
4.
Preventing electric shock by earthing the unit
When installing the unit, be absolutely sure to earth (ground) it.
electric shock resulting from deterioration of electrical insulations
This unit comes with a 3-pin plug having one earth pin. Earthing work is not required in the case of a
3-pin power outlet equipped with an earth contact.
If the power outlet is not a 3-pin outlet equipped with an earth contact, ask a qualified contractor to do
the earthing work.
5.
Setting up the shelves
Three shelves are packaged at the bottom of the chamber.
Set the shelves firmly in place on the shelf stoppers at the
standard locations. (Fig. 3)
6.
Installing an earth leakage circuit breaker
Install an earth leakage circuit breaker (on the unit's power
supply side), which is mandatory under the applicable laws
and regulations.
Contact our sales representative or agent to arrange the
installation of an earth leakage circuit breaker.
18
Earthing is necessary to prevent
Shelf stopper
Fig. 3

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido