- Failure to do so may result in burnout or malfunction.
When connecting pipes, satisfy the minimum insertion depth requirement for copper pipe joint, and the gap between the pipe outer wall and the joint inner wall as follows.
B
Procedures
(1)
(2)
(After brazing, keep supplying a
section is cooled down to 200ºC or
lower.)
Notes:
Keep the heated area to a minimum and braze the pipes at the appropriate temperature.
After brazing pipes, do not splash water on the pipes to cool them down.
Make sure to check the components of the antioxidant before use. The components must not corrode the pipes if mixed with the refrigerant or refrigerant
oil.
10
Pipe size (D)
5 or more, less than 8
8 or more, less than 12
12 or more, less than 16
D
A
16 or more, less than 25
25 or more, less than 35
35 or more, less than 45
N
Brazed section
2
Cylinder
Stuff something in the pipe to keep air from enter-