Hunter Low Profile 90055 Instrucciones página 5

Ventilador para baño con luz
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

9
Pop out the first wiring access slug. Use second if needed.
For New Construction - suspended between joists go to step B11, page 8
For Existing Construction - accessible from above go to step C11, page 11
For Existing Construction - accessible only from below go to step D11, page15
New Construction – attaching to joist
A11
Position the correct depth mark at the bottom edge of the
joist based on the thickness of your sheetrock.
41719-01 3/29/2006
41719_EngS_3.29.06.indd 5
Choose Installation Option
For New Construction - attaching to joist go to step A11, page 5
5/8
1/2
10
E
Insert the strain relief into the housing and
A12
E
5/8
1/2
Screw pre-loaded screws into joist or framing.
C
secure with the washer.
B
5
3/29/06 9:16:25 PM

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Low profile 90056Low profile 90057

Tabla de contenido