PB 9210 ssembly Instructions
Fig. 7
Bottom Beam Clamp
(4) 1-1/4'' screws
Swing Beam Drill Locations
1. Step 1: Tap t-nut into 3/8'' hole as shown in (Fig. 7).
2. Step 2: Place a bottom beam clamp over the swing hanger as shown in (Fig. 7).
3. Step 3: Insert the swing hanger into the beam and thread it into the T-nut until it is flush or near flush with the
top of the T-nut. A screwdriver may be used to twist the hanger (Fig. 7). Orient swing hanger as shown
in (Fig 7).
4. Step 4: Use (4) 1-1/4'' screws to secure beam clamp.
5. Check hanger to ensure it does not spin.
6. Repeat for all swing hangers.
t-nut
T-nut
Swing Hanger
16
Hammer
3/8'' hole
Use Screwdriver to aid in tightening