Swing-N-Slide Timber-Bilt Turbo Tube Slide Instrucciones De Ensamble página 30

Para adherir este equipo al pinnacle
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
FIGURE 4
1" de la parte de arriba de la cubierta
1 po du haut de la plate-forme
FIGURE 5
30
1" from top of deck
MOUNTING PANEL
1. Position the mounting panel as indicated in Fig. 4
(The stamped "T" should be at the top). The
panel should be centered horizontally and the
bottom of the opening should be approximately 1"
below the deck surface.
NOTE: The holes identified with arrows (Fig.4)
should be clear of any wood surface.
2. Hold the panel in position and mark all hole
locations. Remove panel.
3. Drill a 3/8" hole through the top support at the
locations indicated in Fig.5 (two holes are
required).
4. Drill pilot holes at the remaining hole locations
using a 1/8" drill bit.
NOTE: The pilot holes at each corner hole
location should be approximately 2" deep. The
remaining pilot holes should only be 1" deep.
5. Align the mounting panel to the previously
assembled entrance section (see Fig. 7, page
32). Attach the mounting panel to the entrance
section at the hole locations indicated in Fig. 4
using one 1" bolt, two washers and one loc nut
per hole as indicated in Figure 6.
NOTE: Hand tighten the loc nuts only.
1" bolt
1" perno
boulon de 1 po
washer
arandela
rondelle
FIGURE 6
washer
arandela
rondelle
loc nut
tuerca
écrou de
blocage

Publicidad

Tabla de contenido
loading

Tabla de contenido