Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 14
MyCloud Duo
1.6 Detailed View
Label
DC +12V
Reset
LED
OS
Copy
1.6.1 Power ON/OFF Procedure
Connect the power supply to your device first and only then plug it into the wall socket. To turn on
the device, press the power switch to start up the system. It will take about 1-2 minutes for the
device to go online but the blue system LED (OS) will indicate when the system is ready.
To safely turn off the device, press and hold the power switch for 3 seconds until the blue system
LED (OS) starts flashing. The system will then shut down all services and about 20 seconds later,
it will power down. If for some reason the system is unresponsive, press and hold the power switch
for 6 seconds to forcefully shut down the system and cut off the power.

1.7 HDD Installation

Remove the screw at the bottom of the case and lift the front panel upward and away from the
housing to remove it. Install the hard drives as illustrated below with the top of the drives, where
the label is located, facing each other. Push the drives lightly into place and then replace the front
panel. Mount the front panel and the drives by fastening the screws at the bottom of the case.
Description
USB 2.0 host port
Gigabit Ethernet port
Power receptacle
System reset button
Security lock slot
Power button (blue when turned on)
• Blue = System ready
• Flashing blue = System is starting up or shutting down
Flashing green = Data access
Red = System error
• Orange = USB drive connected (front port only)
• Flashing orange = File copy from USB drive to NAS (front port only)
USB copy button (press to copy files from USB drive on the front to NAS)
USB 2.0 host port
Meaning
[2]
Introduction

Publicidad

Tabla de contenido
loading

Tabla de contenido