Cooper Verdeon Instrucciones De Instalación página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions - Verdeon/VRDN
Arm Installation (Optional)
Mast Arm: Square Pole (Figure 7.) and Round Pole
(Figure 8.)
1.
Insert nut plate into pole and align insert holes with the
mounting holes in the pole.
2.
Insert threaded rods through the top and bottom holes.
Screw into nut plate.
3.
For round poles only - Install round plate adapter with
round side facing pole (Figure 8.). Align holes top and
bottom.
4.
Insert the mast arm onto the threaded rods thru the top
and bottom holes.
5.
Install washers, nuts and Torque nuts using 1/2" open
wrench to 35-40 ft-lbs.
6.
Install cosmetic cover if applicable over arm and tighten
screws.
7 .
Pull wires through center holes on nut plate and pole.
8.
Make electrical connection as established in the
wiring instructions. Refer to the standard installation
instructions.
Straight Arm (Figure 9.)
1.
Insert nut plate into pole and align insert holes with the
mounting holes in the pole.
2.
For round poles only - Install round plate adapter with
round side facing pole (Figure 7 .). Align holes top and
bottom.
3.
Insert bolts through the washer, arm, adapter (if
applicable) and pole top and bottom holes. Screw into
nut plate.
4.
Torque bolts using 3/8" allen socket/wrench to 35-40
ft-lbs.
5.
Pull wires through center holes on nut plate, pole,
adapters and arm.
6.
Make electrical connection as established in the
wiring instructions. Refer to the standard installation
instructions.
4
COOPER LIGHTING SOLUTIONS
IB521002EN
Installation instructions
Cover Plate
Arm
Figure 7.
Arm
Nuts
Washer
Cover Plate
Figure 8.
Adapter
Washer
Nuts
Arm
Electrical Wires
Figure 9.
Backup Plate
Threaded Rods
Nuts
Washer
Electrical Wires
Square Pole
Backup Plate
Threaded Rods
Adapter
Electrical Wires
Round Pole
Backup Plate
Round Pole

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vrdn

Tabla de contenido