installed in the handlebar housing (Varia-
tion 2), then the connecting cable
the switch remains by the central electric
system, is rolled up there and connected to
the switch cable there.
Fasten the cable to the frame of the vehicle, the
vehicle's cable assembly or the paneling holder
with the cable ties included.
Warning
d
The cables must be laid in such a way that
they will not be damaged or inhibit the
function of the motorcycle.
The cables should not be laid along fuel,
brake or coolant lines or Bowden cables.
After laying the cable check the maximum
angle of turn – the cable must not be taut.
•
Drill the cable duct for the connecting cables
10
of the heated mirrors (see Item
Cut out template A (see page 63).
Align the template with both bolts
on the paneling.
Mark the center
ing iron and drill a pilot hole for the hole using a
ø 3 mm bit. Then drill the hole for the cable duct
out to ø 10 mm.
Turn over the template and proceed accordingly
on the left side of the vehicle.
18
)
and lay it flat
of the drill-hole with the scrib-
•
Preparing the mirror housing
11
for
Warning
d
When removing the mirror glass cover it
with a thick cloth and wear protective
goggles – DANGER of INJURY!
Take the mirror
mirror glass
special tool or with two suitable levers.
Press
the mirror housing on the fastening
bolts on the vehicle.
Mark
the position of the hole on the mirror
housing with the ø 10 mm drill bit
Remove the mirror housing and drill the cable
duct
with the ø 3 mm and ø 10 mm bits.
Cut out template B (see page 63) and place it in
the mirror housing.
Mark the center
ing iron and drill through the plastic housing and
the metal plate underneath it using a ø 3 mm and
ø 10 mm bit.
Proceed accordingly with the left mirror housing.
•
Assemble the mirrors
12
Thread the cable
and press the cable bushing
and carefully remove
from the hinge bolt
with the
.
of the drill-hole with the scrib-
into the mirror housing
into place.
the