Fig. 3
Zb
Ab
3. Place the Top Assembly (Ab) face-down on a clean, protected surface. Insert 12 Slats (J) into
the holes in the Left End Apron Assembly (Lb), Center Brace Assembly (Vb) and Right End
Apron Assembly (Zb). Gently tap with a padded hammer. See Figure 3.
Fig. 4
4. Position the Shelf Assembly (Fb) and Left End Support (Sb) over the Slats (J) and insert.
Gently tap with a padded hammer. See Figure 4.
J
J
Vb
Fb
DO NOT GLUE
Lb
Sb
DO NOT GLUE
Page 5 – 636Wb – Rev. 10/08