Panasonic U-16GE2E5 Manual De Instrucciones página 19

Ocultar thumbs Ver también para U-16GE2E5:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 101
Ball valve (provided by installer)
SGP-BV355K (for 25/20 hp)(purchased separately)
SGP-BV 450M (for 16 hp) (purchased separately)
Tubing anchor
Liquid tube (narrow)
Gas tube (wide)
Ball valve (provided by installer)
SGP-VK35K (for 25/20 hp)(purchased separately)
SGP-VK45K (for 16 hp) (purchased separately)
When using single-type vibration-
resistant frames, never install tubing in
the manner shown at the right. Doing so
puts excessive weight on the entire tubing
installation and may result tube damage.
(2) When Using Interlocking Frames
When using interlocking vibration-resistant frames, always use frames designed for use with the GHP-W
Multi series.
* There are is no vibration-resistant frame for connected types of units compatible with U-30GE2E5 or
U-30GEP2E5.
After installing the frame, be sure to install steady braces or other support, and take measures to prevent
applying excessive force to the refrigerant tubing.
If installing gas trip-valve kits or ball valves to each outdoor unit, be sure to install them on the vibration-
resistant frame. (Installation on the ground is prohibited.)
When anchoring the refrigerant tubing, always anchor the tubing at the main tubing to prevent tube
damage from excessive weight.
When determining the anchor position, refer to the dimensions for A in Fig. 22.
Tubing anchor
Main tubing
Gas trip-valve kit
SGP-VK32K
(purchased
separately)
Tubing anchor
Fig. 21-1
Tubing anchor
At least 1.5 m
Fig. 22
EN - 19
(At least 1.5 m)
(At least 1.5 m)
Gas trip-valve kit
SGP-VK32K
(purchased separately)
Liquid tube
Gas tube
Fig. 21-2
Liquid tube
Gas tube

Publicidad

Tabla de contenido
loading

Tabla de contenido