Scope Of Delivery - SMA Sunny Mini Central 9000TL Instrucciones Para La Sustitución

Ocultar thumbs Ver también para Sunny Mini Central 9000TL:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 86
SMA Solar Technology AG
Observe superordinate standards
The repair work on devices and the consideration and application of other standards which
correspond to a superordinate standard is the responsibility of the qualified person performing
the work. Unauthorized alterations will void guarantee and warranty claims and in most cases
terminate the operating license. SMA Solar Technology AG shall not be held liable for any
damage caused by such changes.
3

Scope of Delivery

Check the scope of delivery for completeness and any externally visible damage. Contact the
Service if the delivery is incomplete or damaged.
A
Figure 1 : Components included in the scope of delivery
Position
Quantity
A
1
B
1
C
1
Replacement Manual
Designation
Power assembly (AST)
4 module screws (M5x18) and 7 screws with a microencapsulated
pre-coating (M4x15)
Set with cleaning cloths
3 Scope of Delivery
C
AST-SMC9-11-RM-xx-10
B
11

Publicidad

Tabla de contenido
loading

Tabla de contenido