Scope Of Delivery - SMA Sunny Tripower 8000TL Instrucciones Para La Sustitución

Ocultar thumbs Ver también para Sunny Tripower 8000TL:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 99

3 Scope of Delivery

Damage to the enclosure seal in subfreezing conditions
If you open the inverter when temperatures are below freezing, the enclosure seals can be
damaged. This can lead to moisture entering the inverter.
• Only open the inverter if the ambient temperature is not below -5°C.
• If a layer of ice has formed on the enclosure seal when temperatures are below freezing,
remove it prior to opening the inverter (e.g. by melting the ice with warm air).
Damage to the inverter due to sand, dust and moisture
Sand, dust and moisture penetration can damage the inverter, thus impairing its functionality.
• Only open the inverter if the humidity is within the thresholds and the environment is free of
sand and dust.
• Do not open the inverter during a dust storm or precipitation.
• Close the inverter in case of interruption of work or after finishing work.
Damage to the inverter due to electrostatic discharge
Touching electronic components can cause damage to or destroy the inverter through
electrostatic discharge.
• Ground yourself before touching any component.
Grounding conductor test prior to recommissioning
Prior to recommissioning SMA inverters after the installation of SMA components or power
assemblies which cannot be replaced intuitively, ensure that the grounding conductor in the
inverter is correctly connected. The function of the grounding conductor must be ensured and
all locally applicable laws, standards and directives must be observed.
Observe superordinate standards
The repair work on devices and the consideration and application of other standards which
correspond to a superordinate standard is the responsibility of the qualified person performing
the work. Unauthorized alterations will void guarantee and warranty claims and in most cases
terminate the operating license. SMA Solar Technology AG shall not be held liable for any
damage caused by such changes.
3
Scope of Delivery
Check the scope of delivery for completeness and any externally visible damage. Contact the
Service if the delivery is incomplete or damaged.
Quantity
1
10
DCCON-STPTL10-RM-xx-10
NOTICE
NOTICE
NOTICE
Designation
DC assembly
SMA Solar Technology AG
Replacement Manual

Publicidad

Tabla de contenido
loading

Tabla de contenido