RIDGID HD16400 Manual Del Usuario página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY
WET/DRY VAC ASSEMBLY (Fig. 4)
1. Attach Powerhead Assembly to Dust Drum:
Line up front of Powerhead Assembly (A) with
the Vac Inlet Port located on the front of the Dust
Drum (B).
2. Place Powerhead Assembly (A) on top of Dust Drum
(B) and push down on the top of the Powerhead
Assembly snapping the Flexible Locking Tabs of the
Dust Drum into the Powerhead Assembly Latch
Lock Holes.
3. Be sure Powerhead Assembly completely covers
the top of the Dust Drum and the Flexible Locking
Tabs are fully snapped into place to avoid any
leakage and to prevent the Powerhead Assembly
from coming off.
4. To Remove Powerhead Assembly: Push in on the
Flexible Locking Tabs, disengaging them from the
Powerhead Assembly Latch Lock Holes and pull up
on the Powerhead Assembly.
(A)
Powerhead
Assembly Latch
Lock Hole (2)
Dust Drum
Flexible Locking
Tab (2)
Vac Inlet Port
(B)
CARRY HANDLE / POWER CORD WRAP
ASSEMBLY (Fig. 5)
1. Locate the Carry Handle / Power Cord Wrap (D) and
the Two #10 x 3/4" Pan Head Screws (E) in loose
parts bag.
2. Position the Carry Handle / Power Cord Wrap (D) on
top of the Powerhead Assembly (A), with the Carry
Handle / Power Cord Wrap Extended Flange to the
rear of the Powerhead Assembly, as shown.
3. Insert a #10 x 3/4" Pan Head Screw (E) through the
Hole at each end of the Carry Handle / Power Cord
Wrap (D) and into the Powerhead Assembly (A).
Tighten securely.
ATTACHING AND REMOVING VACUUM HOSE
(Fig. 6)
1. To Insert Hose: Locate the end of the Tug-A-Long
Positive Locking Hose with Dual-Flex (I) and align
the Hose Locking Tab with the Dust Drum Vac Inlet
Ridges. Push the Hose cuff straight into the Vac
Inlet Port until the Hose Locking Tab fully engages
Fig. 4
the Dust Drum Vac Inlet Ridges.
2. To Remove Hose: Rotate the end of the Tug-A-
Long Positive Locking Hose with Dual-Flex (I) in
either direction to release the Hose Locking Tab
from the Dust Drum Vac Inlet Ridges. You may also
press the Hose Locking Tab and pull the Hose end
straight out of the Vac Inlet Port.
INSERT HOSE
5
Fig. 5
(E)
(D)
(A)
Fig. 6
Inlet Ridges
Vac Inlet Port
Hose Locking Tab
(I)
REMOVE HOSE

Publicidad

Tabla de contenido
loading

Tabla de contenido