CHIEF MSP-DCCUST1 Instrucciones De Instalación página 11

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 12
Installation Instructions
Cable Management (Optional)
1.
Route cables/cords from projector through opening on
projector arm and route to wall. (See Figure 18)
2.
Guide cables/cords from wall end of projector arm upward
or downward through slots in wall plate. (See Figure 18)
2
2
Projector arm
opening
Figure 18
Add Plastic Covers
1.
Add right and left plastic covers (E and F) over brackets.
(See Figure 19)
2.
Fasten covers using four 10-24 x 5/8" Phillips cap head
screws (HB). (See Figure 19)
1
(E)
(A)
2
Figure 19
1
Projector
2
(HB) x 2
1
(HB) x 2
3.
Add end cap (D) to end of short throw projector arm. (See
Figure 20)
(D) x 1
3
(F)
MSP-DCCUST1
Figure 20
11

Publicidad

Tabla de contenido
loading

Tabla de contenido