Connect Power; Leveling - GE PCR06BATSS Manual Del Propietário

Ocultar thumbs Ver también para PCR06BATSS:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

LEVEL
3
• Use an adjustable wrench to turn the leveling legs and
raise or lower the product.
• Adjust carefully; the product should be level and plumb
with cabinetry, and should align with adjacent toekick
height.
Turn Right to Lower
Turn Left to Raise
If you skipped Step 2:
• Select the hinge cover marked "R" or "L", depending on
door swing.
• Peel backing off the tape inside the decorative hinge
cover. Press and snap into position.
Installation Instructions
12

CONNECT POWER

4
• Connect power cord plug to a properly grounded
receptacle.
• Make sure power is on by opening the door to see if
interior light turns on.
SLIDE PRODUCT INTO THE CUTOUT
5
• Carefully slide the unit into the opening. Be careful not
to entangle power cord.
• Make certain that the door protrudes 1" beyond the
surrounding cabinets.
• Check again to be sure the unit is level.
SET TEMPERATURE CONTROLS
6
• The temperature controls are preset. Refer to the
Temperature Control section for more information.
Allow 24 hours for temperature to stabilize.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pcr06watss

Tabla de contenido