INSTALLATION PROCEDURE — SMALL COVER
1. Determine the location of the
water supply pipe.
2. If necessary, slide a sweat
solder adapter on the water
supply pipe
3. Attach the control stop to
the pipe.
4. Bore a guide hole for the flush
pipe into the wall.
NOTE: Thread sealing
compounds should be
used on the male NPT
threads only.
To use with a left water supply, detach
the controller and remount it to
opposite side of valve body.
Protect the wire connections
inside the controller's case.
5. Secure back frame to the wall with two screws the
base frame. Other base frame installation options
with stringer and for concrete wall on next page.
NOTE:
Wall thickness must be 1/2" (13mm)
minimum and 1-3/8"(35mm) maximum.
If your wall thickness is less than
1/2" (13mm), please attach wooden
frame behind the wall.
Left water supply pipe
1"NPT (toilet), 3/4" (urinal)
** 3-11/16"
(94 mm)
4 x Ø5/16" (Ø8mm) hole
Urinal top spud
-5/16" (
33 mm) hole
Ø1
Ø
Toilet top spud
2-3/16" (
56 mm) hole
Ø
Ø
Urinal back spud
-5/16" (
33 mm) hole
Ø1
Ø
Toilet back spud
2-3/16" (
55 mm) hole
Ø
Ø
* X", ‡ = At least 5" clearance from sensor to tip of toilet seat up position or
to top of grab bar is required to avoid false detection.
** Opening in wall
Detatch
10
4-3/4" ± 1/2"
Right water supply pipe
(120 ± 13mm)
1"NPT (toilet), 3/4" (urinal)
1-1/4" (31 mm)
CL of sensor
** 3-11/16"
(94mm)
Remount
X"