Wall Installation; Connectivity - Allied Telesyn AT-FS704 Guia De Instalacion

Tabla de contenido

Publicidad

Wall Installation

The AT-FS704 comes with a wall mount kit. This kit includes two screws and
two plastic anchors. For a proper placement on the wall, follow these
installation requirements:
Select a site that is free of obstructions from other equipment or
devices. Consider the following points for site selection:
The switch should be placed high enough so that LED indicators
can be observed and cable and power connections can be made.
Now is the time to decide whether you want the switch placed with
the front panel facing up or to the side.
Drill two holes into the wall the same distance apart as the screw
support holes located on the bottom of the switch. Do not drill these
holes too deep.
Insert the plastic anchors into the holes in the wall and secure them
with gentle hammer taps.
Insert the screws provided with the wall mount kit into the plastic
anchors and partially screw them in. Do not insert the screws with
excessive torque. Note that the screw head along with a small portion
of the screw body should be sticking out.
Gently place the switch onto the wall with the front panel facing up or
down by sliding the screws into the provided slots.
Attach all power and network connections at this time, as described in
the Connectivity section, below.

Connectivity

This section describes how to connect the AT-FS704 to your Fast Ethernet
network, including:
PC to Switch
Hub to Switch
Hub without Uplink (MDI) Port
Switch to Switch (other devices)
AT-FS704 Installation Guide
9

Publicidad

Tabla de contenido
loading

Tabla de contenido