Descargar Imprimir esta página

Yakima 8000222 Guia De Inicio Rapido página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

Remove covers from
Landing Pads.
Slide Landing Pads onto the tracks to the
positions where the Control Towers will be
attached.
Installation Tips:
CROSSBAR SPREAD:
The distance between the Yakima
crossbars is determined by the
accessories you wish to carry.
The Crossbar Spread Table (Fit List or
Catalog) will tell you how much crossbar
spread your accessories require.
YOU ARE NOW READY TO PROCEED TO CONTROL TOWER INSTRUCTIONS.
1033029A-2/6
Assemble Landing Pad.
• Insert washer and screw.
• LOOSELY install hooks.
• Do not tighten completely.
Engage the screw with
wrench supplied.
Hooks must
engage track
before fully
tightening
screws.
Do not fully tighten. Final
Base should be
adjustments can be made
flush to track.
after Control Tower is
LOAD LOCATION:
For ease of loading, consider where the
most convenient placement of your load
would be before completing the
installation.
Factory crossbars or accessories
may need to be removed.
NOTE:
installed.
Hook Landing Pad onto track.
• If hooks do not engage, loosen
screws and re-attach.
USE CAUTION WHEN
OPENING YOUR HATCH.
On some vehicles, hatch
interference with
accessories is unavoidable.

Publicidad

loading