ROBLIN OSMOSE Serie Manual De Instrucciones página 11

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27
- 3 metres with 2 x 90° bends.
- 2 metres with 3 x 90° bends.
The above assumes our 150 mm (6 INS) ducting is being installed. Please note ducting components and
ducting kits are optional accessories and have to be ordered, they are not automatically supplied
with the chimney hood.
IN THE EXTRACTION MODE:
a. Place the anti-backflow flat (8 ) over the round outlet (6) and connect the ducting 150mm (6 INS)
over the round outlet (6) on top of the canopy and secure the connections with appropriate clamping
rings or adhesive tape F i g . 5 .
IN THE RECIRCULATION MODE:
a. Fit the recirculation spigot bracket (4 ) onto the upper chimney wall bracket using the same fixin
screws F i g . 7 (2). Put the spigot (R ) into the spigot bracket (4 )• Insert the connection extension
pieces laterally (G ) in the spigot. Make sure that the outlet of the extension pieces (G ) is horizontally
and vertically aligned with the chimney outlets.
b. Connect the ducting 150mm (6 INS) not provided between motors (6) and the recirculation spigot
and secure the connections with appropriate clamping rings or adhesive tape.
c. Open the deflector and remove the grease filter and insert the charcoal filter into the base of the
motor housing and secure the filter with two metal securing straps item ( ) as illustrated in Fig. 4.
5.1) Open the deflector and remove the grease filter (see paragraph Maintenance) being sure tha
the connector of the feeding cable is correctly inserted in the socket placed on the side of the fan
Fig.4 . Before fitting the chimney to the canopy make the electrical connection as described in the
section titled ELECTRICAL. When the electrical connection has been made, test the lights and the
fan motor.
5.2) Upper chimney stack
Slightly widen the two sides of the upper chimney stack Fig.7 (7a) and hook them behind the
brackets item 2 making sure that they are well seated.
Secure the sides to the upper bracket using the 2 screws (12 ) (2,9 x 9,5) supplied.
5.3) Lower chimney stack
•Slightly widen the two sides of the chimney stack F i g . 7
chimey stack and the wall, making sure that they are well seated.
(7 b ) and hook them between the upper
GB
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

325.0538.658

Tabla de contenido