Descargar Imprimir esta página

Cequent Towing Products 50140 Instrucciones De Instalación página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION FOR 30124 RAILS ONLY
PLEASE READ ALL INSTRUCTIONS BEFORE STARTING INSTALLATION
Equipment Required:
Fastener Kit: 116629
Wrenches: 3/4, 7/8, 15/16
Drill Bits: 1/8 in., 9/16 in., 11/16 in.
Other Tools: Center Punch, Measuring Tape, 1-1/8 in. hole saw
5
10
15
16
Inside frame
2
DIESEL
APPLICATION
SHOWN
#
1
FRAME BRACKET, FORWARD LH
2
FRAME BRACKET, REAR LH
3
FRAME BRACKET, FORWARD RH
4
FRAME BRACKET, REAR RH
5
CARRIAGE BOLT, 5/8-11 x 3-1/2 in.
6
CARRIAGE BOLT, 5/8-11 x 6 in.
7
TUBE SPACER, 4 in. LONG
8
CONICAL WASHER, 5/8 in.
z
2010 Cequent Towing Products, Inc.
9
11
8
4
DESCRIPTION
QTY.
PCN 15243
VEHICLE
1
FORWARD
Drivers side
14
Passengers side
#
DESCRIPTION
1
9
TUBE SPACER, 1-1/4 in. LONG
1
10
SPACER 5 X 1-1/2 x 5/16 in.
1
11
U-BOLT, ½-13 x 7-3/4 x 4-1/2 in.
1
12
HEX NUT, 1/2-13 in.
2
13
CONICAL WASHER, ½ in.
2
14
NUT, 5/8-11 in.
2
15
CARRIAGE BOLT, 1/2-13 X 1-3/4 in.
4
16
BLOCK, 1 x 3 x 1/4 in.
Sheet 6 of 30
FIGURE 4
6
12
QTY.
2
2
4
9
9
4
1
1
50140N
05/17/11
Some of the
fasteners
shown are
supplied with
the rail kit.
7
3
13
Rev. E

Publicidad

loading

Productos relacionados para Cequent Towing Products 50140