Installation; Connecting Control Voltage Cables - Vetus BPPPA Manual De Instalación

Ocultar thumbs Ver también para BPPPA:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 30
3

Installation

3 .1

Connecting control voltage cables

• Mount the control panel at the helm position. There must be 150
mm of free space behind the panel.
• Make a hole of the correct size and fit the panel. See principal di-
mensions page
72
• Connect the panel as shown in the diagram.
All types BOWPRO A,
except BOWA0571, BOWA0761
Control panel
Terminator
Connection cable
Hub
+
12 V
Control voltage fuse
7
+
12 V
3
7
+
12 V
3
The CAN bus is a chain to which the bow thruster and the panels are
connected.
vetus® Installation manual BPPPJA - BPPJA - Proportional panel for bow and stern thruster
Connection box thruster
Connection cable
CAN-bus supply
M
M
7
+
12 V
3
n
ote
n
ote
Consult the relevant Bow and/or Stern Thruster installation manual
for the detailed CAN-BUS diagrams.
+ BOWA0571, BOWA0761
Terminator
Connection box thruster
12 V
Control voltage fuse
+
12 V
M
+
12 V
At one end of the chain, the power supply (3) must be connected
and the terminator (7) must be connected at the other end!
The CAN bus power supply must always be
connected to 12 Volt
All types BOWPRO B
Control panel
Connection cable
Connection cable
+
CAN-bus supply
7
3
7
3
ENGLISH
M
M
13
020815.11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Bppja

Tabla de contenido