General Operation - Watson-Marlow 505LA Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 191
13

General operation

Opening the pumphead guard
Isolate the pump from the mains power supply.
l
Disconnect the tubing from the external pipework.
l
Lift the two levers at either side of the pumphead and remove the track.
l
Follow the reverse of the installation process above to remove the tubing from the pumphead.
l
Pre-load checks
Before loading tubing, ensure that all rollers rotate freely, that the tube ports and location grooves
l
are clean
Closing the pumphead guard and start-up
Ensure no debris, loose fastenings or other foreign objects are in
pumphead before start-up. Failure to do so may result in an explosion
hazard.
PB0379:m-505atex-en-04
23

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

505lxa505lga

Tabla de contenido