Tabla de contenido

Publicidad

18

CIP

General
Unlock the guard and disengage the rollers within the tube zone.
l
Close the guard and squeeze against the track until the latch clicks.
l
Observe a 1m safety area.
l
CIP
LoadSure tube elements and continuous tubing can be cleaned using CIP processes.
l
Ensure that the tubing material is chemically compatible with the cleaning agent that is to be used.
l
If cleaning agents are spilled over the pumphead, wash down immediately.
l
Ensure that controlled waste pipework is fitted to allow a safe release of cleaning agent in the event of
l
a tube failure.
35
PB0347:m-620atex-en-03

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

620rea serie620re4a serie

Tabla de contenido