Preparation; Basic Safety Instructions - Conergy SmartControl System Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Conergy SmartControl System
5.3

Preparation

Before installing the Conergy SmartControl System hardware
components, clarify the following points with respect to the
local installation requirements:
| Installation location of the ET sensor
| The connection between the ET sensor and the Conergy
SmartControl
| Integration into a suitable surge protection device
| Installation location of the Conergy SmartControl and
power supply unit
| Internet connection at the installation location
Note the network connection requirements as laid out in
(see Chapter 8.1, page 75).
5.4

Basic safety instructions

DANGER
High voltages!
| Before fitting the hardware components of the Conergy
SmartControl System, de-energise the PV system by
activating the disconnector.
| Verify that the device is safely isolated.
| Ensure that the system cannot be switched back on again.
DANGER
Risk of electrical accident!
In any work involving live system components and leads
there is a risk of electrical accidents.
A second person is required to be present at all times, who
can disconnect the power supply and offer help in the case of
an unforeseen accident.
Operating manual
5 Important installation instructions
33

Publicidad

Tabla de contenido
loading

Tabla de contenido