Zoeller 1450-0009 Manual Del Usuario página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
NOTE: Schedule 80 PVC pipe (sold separately) is recommended. If you use black poly pipe (sold
separately), the pipe must be rated for 160 PSI and be no longer than 200 ft.
NOTE: The pump must be assembled with piping on the ground before lowering into the well. Lay out
all necessary materials near the well.
NOTE: All threaded joints and connections should have thread tape (not included) applied, tightened
securely with a pipe wrench (not included) and then tightened an additional 1/4 turn.
Follow step 1a and 1b below for Schedule 80
pipe or step 2a and 2b for black poly pipe.
Schedule 80 pipe (recommended)
1a. Apply thread tape and then thread the
pipe directly into the pump discharge and
tighten. For 1 in. pipe, you will also need a
1-1/4 in. x 1 in. reducer bushing, not shown.
(Fig. 1a)
1b. Slide the two hose clamps packaged with
the torque arrestor (sold separately) over
the end of a short piece of Schedule 80
pipe (approximately 4 ft. long). The pump
will be easier to handle if a short piece is
installed first. Continue to Step 3.
(Fig. 1b)
1a
1b
Torque
Arrestor
6
Schedule
80 Pipe

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

1451-00061452-00051452-0007

Tabla de contenido