Vetus HATO212B Instrucciones De Instalación Y Manual De Manejo página 15

Inodoros marinos eléctricos
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 34
110 V / 230 V
5.8 Connections
5.8.1 Outlet
Slide the rubber sleeve (F) over
the outlet connection.
Fit the non-return valve (G) using
the hose clamp (H).
N.B.!
The non-return valve (G) must
be fitted vertically with the
arrow upwards.
Reducing piece:
1 Fit the reducing piece (Q) into the non-return valve (G).
2 Tighten the reducing piece using the hose clamp (H).
 Fit the outlet hose (ø 19 mm).
ø 19
Q
ø 32
ø 19
G
G
1
5.8.2 Water supply
The flexible water supply hose attached to the motor housing
has a /4" connection.
Connect the flexible water supply hose to the ball valve on the
water supply pipe.
5.10 Testing
Open the ball valve in the water supply pipe completely so that
there will be a sufficient supply of water for flushing. Press the
button once and check whether the cycle is carried out properly.
Throw a few pieces of toilet paper into the pot and check the
cycle again.
Remove the pot and check that there are no leaks at any of the
connections.
Electric marine toilets HATO...
F
F
G
H
ø 19
ø 19
H
G
2
3
5.9 Fitting the toilet pot
Do not fit the toilet pot permanently until all the connections
have been made.
Make sure that the plastic socks (D) are on the threaded studs.
Fit the pot over the threaded studs and fix it provisionally.
5.11 Final fitting
Position the toilet pot over the threaded studs.
Now place the plastic washers (L) and the bolts (B) on the
threaded studs and tighten up the bolts. Fit the plastic caps (M)
on the nuts.
Use a sharp knife to cut off any
excess packing.
Use silicone sealant to seal the
gap between the toilet pot and
the wall.
      ENGLISH
110 V / 230 V
15
110128.01

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hato224bHato110Hato220

Tabla de contenido