Installation Type #1 19 880
If both rough-in outlets are used, you have to install a spout
with diverter. If only the lower rough-in outlet is used, you
have to install a spout without diverter.
1. Install control unit and secure with screws, see Fig. [5].
2. Close valve by turning the adaper (A) clockwise until it
stops, see Fig. [6].
3. Open the hot and cold integrated service stops.
4. For installation of handle parts, see Fig. [7].
5. While installation observe the right mounting position.
If the pressure balancing valve is installed too deep, the
fitting depth can be increased by 25mm or 1" with an extension
set, Part No. 47 823, see page II.
5
7
3
B
C
English
Note:
The preset maximum temperature will change if the inlet
temperatures change or the setting of the water heater
thermostat is altered or if the water inlet temperature is
fluctuating.
Operation
Turn lever anti-clockwise:
- Open from cold to hot water flow, see Fig. [8].
The adjustable hot water limit stop (B) is factory set at a
position to limit maximum outlet temperature to below the hot
water supply temperature, see Fig. [7]. For installations where
there is need to modify the limit temperature, remove the limit
stop (B) and replace in a more clockwise position for colder
water, or more counter-clockwise position for hotter water.
Observe the mounting position of stop (C).
6
8
A