K2 Pumps WPS05004K El Manual Del Propietario página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7.
Install a 1in.×3/4in.PVC Male Adapter to the
galvanized tee. (Fig. 7)
9.
Completed well installation with piping and tank is
shown (Fig. 9)
NOTE: If a pre-charged tank becomes waterlogged, the bladder is normally leaking or broken.
1. Test the tank by depressing the air valve. The air valve will expel water if the bladder is broken.
2. Replace the tank. Once a bladder is leaking or broken, the bladder cannot be repaired. The tank must be
replaced.
Standard Tank (CONVENTIONAL TYPE) Connection
From step 1 to 3 is the same as Pre-Charge Tank Connection.
4.
Cement 3/4in.PVC rigid Pipe into 3/4in.PVC 90-
Degress S×S Elbow. Cement 3/4in. PVC MPT×S
Male Adapter into 3/4in.PVC rigid Pipe that connect
with a 3/4in. PVC FPT×FPT Union. (Fig. 4)
8
8.
Install a short 3/4in.PVC rigid Pipe. (Fig. 8)
5.
Install a 1 in. male NPT x 1 in. female NPT x 1 in.
female NPT galvanized tee to the outlet of the pump.
(Fig. 5)
For Professional Technical Support call 1-844-242-2475

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Wps07504k

Tabla de contenido