Installation Burner Assembly - Ecoflam BLU 1000.1 LN PAB Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 36
EN
Installation
A
A1
Gas lines
When installing the gas lines and gas train,
the general EN676 directives and
guidelines must be observed.
Additional accessories and kits shall be
installed by the installer in accordance to
the local safety regulations and codes of
practise.
Upon the installer responsibility
it is mandatory to install
additional support(s) in order to
WARNING
not overload the burner body
with the dead load of full gas train,
accessories, piping and so on. The
burner body can stand just the gas
valve and the piping between the gas
valve and the body.
LEGENDA
Pf: Back pressure of furnace
Pb: Pressure of burner (combustion head
+ complete gas train)
Pin: Minimum inlet pressure
10
­ Burner assembly
Installing the gas train
General regulations applying to the
gas connection
• The gas train must only be connected
to the gas mains by a recognised
specialist.
• The cross-section of the gas line should
be of a size designed to guarantee that the
gas flow pressure does not drop below the
specified level.
• A manual shut-off valve (not supplied)
must be fi tted upstream of the gas train.
The gas train is supplied
separately, for fitting refer to the
instructions in the gas train
manual.
WARNING! REMOVE THE BLOCK
INSIDE BLAST TUBE BEFORE
INSTALLING THE BURNER.
WARNING
Burner assembly
The burner is fixed to the boiler.
Installation:
• fix the flange 3 to the boiler with
the screws 4
Removal:
• loosen the screws and remove the
burner.
Burner blast tube insertion depth and
brickwork
Unless otherwise specified by the boiler
manufacturer, heat generators without a
cooled front wall require brickwork or
insulation 5 as shown in the illustration.
The brickwork must not protrude beyond
the leading edge of the blast tube, and
should have a minimum conical angle of
60°. Gap 6 must be filled with an elastic,
non-combustible insulation material. For
boilers with reverse firing, the minimum
burner tube insertion depth A as speci fied
in the boiler manufacturer's instructions
must be observed.
On boilers the blast tube insertion depth
should be observed as per the boiler
manufacturer's instructions.
Reverse flame boiler :
A = 50-100 mm.
Three pass boilers :
A1 = 50-100 mm.
Exhaust system
To avoid unfavourable noise emissions,
right-angled connectors should not be
used on the flue gas side of the boiler.
In order to change the burner operation
from natural gas to LPG you have to fol-
low these instructions :
- Remove the blast tube.
- Replace 4 Diffusers with LPG version,
remove A screws.
- Remove the disc.
- Replace Tooth with LPG version.
- Install the disc correctly.
- Replace the blast tube with LPG version
(not for LN version).
A
420010605300

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Blu 1000.1 pabBlu 700.1 ln pabBlu 1200.1 pabBlu 1200.1 ln pab

Tabla de contenido