Installation (continued)
9
Making the water supply
connections
□
Use 1/2 in. I.P.S. faucet connections (2), or use
supply line coupling nuts (3) (not included) with
a 3/8 in. O.D. ball-nose riser (1).
□
Use wrenches to tighten the connections. Do not
overtighten.
Operation
1
Flushing and checking for leaks
□
Ensure the faucet (A) handles are in the off
position and turn on the water supply to check
for leaks. If you discover any leaks, check your
connections to ensure they are installed properly.
□
Turn on the hot and cold handles to allow the
water to run for at least one minute. This
ushes away any debris that could cause
damage to internal parts.
□
Turn off the water.
1
3
8
2
A