Commissioning - Kemper SmartFil Instrucciones De Servicio

Ocultar thumbs Ver también para SmartFil:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 148
Position the extraction arm so that the extraction hood is located
approx. 25 cm diagonally above the weld.
The extraction hood must be positioned so that it safely captures the
welding fumes, taking into account the movement of welding fumes
caused by the heat and the extraction range.
Always move the extraction hood with respect to the weld position as
you advance.
WARNING
An incorrectly positioned extraction hood or too low an extraction
capacity do not ensure that air containing hazardous substances is
captured adequately by the extraction hood. This means hazardous
substances can enter the area where the operating personnel breathes
and cause severe damage to health.

6.4 Commissioning

WARNING
Danger due to faulty product condition.
The product must be fully installed before commissioning begins. All
doors must be closed and the necessary connections must have been
made.
1502818-03
Fig. 11: Positioning the extraction hood
- 61 -
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido