Gardebruk Deuba 108267 Manual De Instrucciones página 7

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Prior to starting the installation, familiarize yourself with the relevant
local rules and regulations. Find a stable and level place as a base. Set up
the building only when the weather is fine and dry. Do not install if there
are strong winds!
If possible, set up the greenhouse together with 3 or more people.
Otherwise, there could be material damage or even injuries.
•Choose a location that has enough space around the greenhouse for
working.
•Carefully follow the steps in the instructions to ensure correct
installation.
•Before starting the installation, make sure that all parts are present.
•Make sure the foundation frame is flat on the floor.
•The foundation must be level. If the floor is uneven, level it.
• Always wear safety gloves, long sleeves and eye protection during
installation. Some parts may have sharp edges and may cause injury!
• Do not attempt to assemble it in windy weather conditions as
there is a risk that panels may be damaged or people injured.
•Prepare a first layer of stones or gravel for a reinforced concrete
foundation. The foundation should be at least 10 cm thick. Allow the
concrete to dry for at least 48 hours.
•The foundations can also be made of bricks, stone blocks or concrete
pedestals.
•Your shed must be firmly anchored to the ground to prevent
damage from strong winds. Check the anchors in the ground daily.
•Do not enter into the roof! DANGER OF COLLAPSE!
It is necessary to anchor the greenhouse to the ground. The big
greenhouse has a large contact surface for wind, which can lead to
significant injuries and/or damages.
Give yourself plenty of time fort he installation process and once
Instructions
www.DeubaXXL.de
7

Publicidad

Tabla de contenido
loading

Tabla de contenido