Fabrication Nº:
Equipment:
OPERATING INSTRUCTIONS AND MAINTENANCE MANUAL
Operations
Temperature
Dosing
Types of end of process/change of step
By time
By VCR Temperature
By Fuser Temperature
By dosage
By time or VCR
temperature
Description of the selectable operations:
1. Heating:
The reactor starts to be heated by circulating steam through the double jacket until
it reaches the temperature set by the user in the operation set point or the time set
by the user runs out. Before steam is circulated through the jacket, it will be
automatically drained for the duration set by the user (see Section 9.3.1).
2. Cooling:
The reactor begins to be cooled by circulating cold water through the double jacket
until it reaches the temperature set by the user in the operation set point or the
time set by the user runs out.
3. Drain double jacket:
The jacket is drained by the drain valves being opened for the duration set by the
user in the synoptic (in this case, the time entered by the user in the programme
settings for the drainage prior to the heating operation will not be taken into
account).
4. Dose PW/PGL/GCR:
The dosing of the selected product into the reactor starts by the dosing valve being
opened, according to the value entered by the user in the operation set point field
and the spill value calculated by the user (see Section 9.3.2). The process will end
once the entered amount has been dosed.
Ref. ProJect / Revision:
721021-07 / R01
721021-70-1 / 721021-70-3
VESSEL FOR CREAMS – Mod. VCR 1002 / MELT TANK – Mod. MET 0400
No selection
Heat
Cool
Drain double jacket
No selection
Dose PW
Dose PGL
Dose GCR
It ends the process once the user-set time has run out.
It ends the process once the inside of the reactor
reaches the temperature set by the user.
It ends the process once the volume set by the user has
been dosed.
It ends the process by time or by VCR temperature,
whatever happens first.
Client:
UNIPHARMA
Date:
11-2015
EN
ES
MDI VCR (v1.0)
51 of 153